The cracks on the front patio of Spadina Towers (as shown in these May, 2013 photos), were repaired in 2010, in an attempt to address long term deferred maintenance. Obviously, both the product and workmanship has proven to be defective.
No followup to this work has been conducted since and the unfortunate consequences are obvious. There is of course the very same neglect of the required followup maintenance and followup treatment of cracks on other areas of the parkade surface that was conducted about ten years ago.
The recommended address to the problem at that time included a sustained annual maintenance program. The contractor was VECTOR CONSTUCTION LTD. However, no such maintenance has taken place for a number of years. This is very clearly, a contravention of the bylaws as referenced below.
Section 10.1 Maintenance and Repair
The Corporation shall keep in a state of good and serviceable repair and properly maintain the common property.